At JW Marriott Mai Khao’s laundry facility in Phuket, the extraction press was successfully replaced in a precisely planned overnight operation. The goal was clear: complete the upgrade with zero impact on daily production and it was achieved.
The installation was completed quickly and efficiently, mirroring the performance of the new press itself. Operating at up to 40 bar, the Kannegiesser PowerPress significantly reduces residual moisture in the linen. This leads to shorter drying times, improved throughput, and substantial energy savings.
Fitted with the original Kannegiesser membrane, the press ensures reliable long-term performance while treating textiles with care, combining durability, efficiency, and fabric protection in one solution.





